Alumno Student Accommodation – Leamington Spa

>

About the Customer The Joyner Group were appointed by Interserve Construction Ltd to undertake the external facades element to what was the Former British Telecom Site in Leamington Spa, to become 2 new blocks of student accommodation. Challenges The pre requisite of the Client-’Alumno Developments’ and the Architect–’Glen Howells Architects’ was that although this was

Winter Gardens Pavilion- Weston Super Mare

>

About the Customer The Joyner Group were appointed by Midas to undertake the external facades element to what was the Winter Gardens Pavilion at Weston Super Mare, which had been purchased by Weston College. Challenges With a major refurbishment along side several new build elements of Construction on this project the confines of the restricted

Trefechan Shops with First Floor Maisonettes

>

Joyner Group were appointed by Merthyr Valley Homes as main contractor to refurbish the external of the Trefechan Shops. The works included 110mm Rockwool insulation with a weather proof acrylic top coat to maisonettes as well as refurbishment to the shop fronts below including removal of concrete canopy. This has drastically improved the aesthetics giving

St Tydfils, Caedraw Flats Refurbishment

>

Joyner Group were appointed by Merthyr Valley Homes as main contractor to refurbish all floors of Caedraw Flats. The works included new suspended ceilings, new fire door and painting throughout lobby areas and communal walkways. This has drastically improved the durability and aesthetics giving a sense of pride to the tenants. KEY  FACTS Total Floors:

Merthyr Town EWI Refurbishment

>

Merthyr Town project is a blended funded programme consisting of Welsh Government Funding, Eco and Landlord contribution. The aim of the project is to improve the thermal and energy efficiency of 120 private dwellings and 70 registered provider properties, to reduce fuel bills and enhance the aesthetic appearance of the area. Management agent Melin Homes,

Solcer House – Low carbon energy positive house built in Wales

>

The Welsh School of Architecture have designed and built Wales’ first low cost energy smart house. The Solcer House is capable of exporting more energy to the national electricity grid than it uses, in an attempt to meet tough new targets for zero carbon housing. “The UK Government – and governments across the world –

Solid Wall Insulation – Tavistock, Devon

>

We were appointed as principal contractor to complete 19 properties for West Devon Homes. The properties were located in a small village on Dartmoor. To assist the client with reducing the costs of the works we approached several funding providers to obtain ECO funding for the works. We obtained several quotes for funding and provided

VALLEYS 2 COAST – Maesteg

>

We were appointed as specialist contractor to apply the EWI system for the project at Oakwood in Maesteg. The project was funded through the Welsh Assembly, Arbed Scheme, Valleys 2 Coast Housing, CESP and CERT. We were appointed as main contractor to complete the first phase of the properties after the original main contractor employed

External Wall Insulation to properties for Tai Calon Community Housing

>

What We Did: We were appointed as specialist contractor to apply external wall insulation (EWI) to a large number of properties (500) in Blaenau Gwent, South East Wales. The local area was in need of a revamp and Joyners were appointed to deliver the works. The benefits derived from the delivery of the works included

Gurnos Estate – Merthyr Tydfil

>

Gurnos Estate – Merthyr Tydfil providing External Wall insulation, Roofing, Rain Screen Cladding The Company was successful with two tenders and appointed as principal contractor to complete works to 72 houses on lot 1 and 68 houses on lot 2, which was at the Gurnos estate, Merthyr Tydfil. Whilst completing these works we were also